Pier Replacement - Photo Chronology
July 2007 - present
|
|
August 2008
|
|
|
|
|
Pretty as a picture!
|
A Tyco cable-laying vessel (I think) headed upriver
past the UNH
research pier
|
|
|
|
|
July 2008
|
|
|
|
|
View from the pier, down to research vessels berthed at the floating docks
|
|
|
|
|
|
June 2008
|
|
|
|
|
Mobilizing for a federal multi-agency training operation
|
UNH ocean research fleet, finally with a place to call home
|
|
|
|
|
May 2008
|
|
|
|
|
New Castle Fire Department - testing seawater fill station
|
|
|
|
|
|
March 21, 2008
|
|
|
|
|
Visiting U.S. Coast Guard Vessel - Chinook
|
ditto, from the water
|
|
|
|
|
March 7, 2008
|
March 6, 2008
|
|
|
|
U.S. Coast
Guard vessel "Flying Fish"
waiting to
escort an LNG tanker into port
|
The UNH Pier, as viewed from the pier parking lot
|
|
|
|
|
February 12, 2008
|
|
|
|
|
View from the south (some blurring as photos were "stitched")
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
Reed & Reed lifting their workboat out of the water
|
Demobilization continues . . . load the crane for transport
|
|
|
|
|
|
|
Research already underway from floating dock
|
Interesting view under the pier . . . not the fish pens, rub rails, battered
piles, pile caps, and wave panels at right
|
|
|
|
|
February 7, 2008
|
|
|
|
|
Gangway installed; dock assembly almost complete
|
80' long gangway; well-built
|
|
|
|
|
February 1, 2008
|
|
|
|
|
Last of the concrete floating docks have arrived
|
View from Fort Constitution Mines Building
|
|
|
|
|
January 24, 2008
|
|
|
|
|
Third delivery of concrete floating docks has arrived
|
Assembly continues
|
|
|
|
|
January 18, 2008
|
|
|
|
|
Gangway (80'
long) and second delivery of floating
docks have
arrived on-site
|
Typical collar
assembly at guide piles
|
|
|
|
|
|
|
View from the
south
|
View from Fort Constitution Mines Building
|
|
|
|
|
January 16, 2008
|
|
|
|
|
First delivery
of concrete floating docks has arrived
|
Assembly
underway; it isn't as easy as they said it would be
|
|
|
|
|
December 28, 2007
|
December 5, 2007
|
|
|
|
Christmas was white but otherwise uneventful.
Looking
forward to January, when floating docks
and electricity are both
anticipated.
|
Reed & Reed pretty much wrapping things up until
the
arrival of the floating docks.
|
|
|
|
|
November 30, 2007
|
|
|
|
|
View from the cove; beautiful day
|
View from Fort Constitution Mines Building
|
|
|
|
|
November 27 & 28, 2007
|
|
|
|
|
Finishing up the paving
|
View along the south side of the pier; UNH fish pens below
|
|
|
|
|
November 21, 2007
|
|
|
|
|
View from the cove
|
Juxtaposition
|
|
|
|
|
|
|
View from the abutment
|
Life ring and fire extinguisher cabinets
|
|
|
|
|
|
|
Final assembly of guide pile bent for end floating dock
|
Electrical unit substation
|
|
|
|
|
November 13, 2007
|
|
|
|
|
Intake strainer for New Castle Fire Department's
seawater fill station
|
Mast for jib crane erected
|
|
|
|
|
November 9, 2007
|
|
|
|
|
Power pedestal with 110-volt and 220-volt outlets
as well as tel/data capabilities
|
Electric davit for small loads
|
|
|
|
|
November 7, 2007
|
|
|
|
|
View from the other side of Harts Cove
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
View along side north side of pier
|
Water view of north side of pier
|
|
|
|
|
November 2, 2007
|
|
|
|
|
Preparing to install guide for floating docks
|
Several floating dock guides installed
|
|
|
|
|
October 31, 2007
|
|
|
|
|
View from pier support facility site
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
View along side south side of pier
|
Davit base (one of four provided)
|
|
|
|
|
|
|
Jib crane pieces waiting to be erected
|
Water utility box - ready for heat trace and insulation
|
|
|
|
|
October 26, 2007
|
|
|
|
|
View from New Castle Town Landing . . . awesome!
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
View from neighbor's house
|
80' long gangway for floating docks; stored off-site
|
|
|
|
|
|
|
View from the end of the pier
|
All of the concrete deck overlay has been placed
|
|
|
|
|
|
|
Water utility box, not yet piped
|
Sewer pump out station
|
|
|
|
|
October 19, 2007
|
|
|
|
|
Pea soup view from the end of the pier looking toward shore
|
Pea soup view from Fort Constitution Mines Building
|
|
|
|
|
|
|
Mooring bollard with pipe horns installed
|
Ladder on north side of pier, mounted to wave/fender panels
|
|
|
|
|
October 16, 2007
|
|
|
|
|
View from the cove
|
View from Fort Constitution Mines Building
|
|
|
|
|
October 12, 2007
|
|
|
|
|
View from the cove
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
View from the neighbor's house
|
View from New Castle Town Landing
|
|
|
|
|
|
|
Drilling for jib crane anchor bolts
|
Completed stainless steel platform in sewage pumping station
|
|
|
|
|
|
|
Words fail me
|
Lowering a mooring bollard into place
|
|
|
|
|
October 11, 2007
|
|
|
|
|
View from hillside behind pier support facility
|
Stainless steel platform inside sewage pumping station
|
|
|
|
|
|
|
Stainless steel railing installation begins
|
Mooring bollard in progress . . . up periscope!
|
|
|
|
|
October 5, 2007
|
|
|
|
|
View from the cove
|
View from Fort Constitution Mines Building
|
|
|
|
|
September 28, 2007
|
|
|
|
|
View from the cove
|
View from Fort Constitution Mines Building
|
|
|
|
|
September 21, 2007
|
|
|
|
|
View from the cove; deck slabs installed to Bent #15 of 17
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
UNH's Gulf Challenger looking for a port to call home
|
Close-up - Bents #12 through #17
|
|
|
|
|
|
|
View from end of pier
|
Looking toward end of pier
|
|
|
|
|
|
|
Vertical black elements are guide rails for fish pens
|
Wave/fendering panels being prepared for installation
|
|
|
|
|
September 18-19, 2007
|
|
|
|
|
Sept. 18 - View from the cove; deck slabs to Bent #9 of 17
|
Sept. 19 - View from the cove; deck slabs to Bent #12 of 17
|
|
|
|
|
September 14, 2007
|
|
|
|
|
View from the cove; deck slabs to Bent #7 of 17
|
View from Fort Constitution Mines Building
|
|
|
|
|
September 12, 2007
|
|
|
|
|
View from the cove
|
South side of pier
|
|
|
|
|
|
|
Deck slabs in place through Bent #5 of 17
|
Last two edge beams installed
|
|
|
|
|
September 7, 2007
|
|
|
|
|
View from the cove
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
Utility work continues
|
Domestic water and fire service branch lines
|
|
|
|
|
|
|
Deck slabs installed to Bent #4 (at dog leg) of 17
|
This is the pile cap for which we have been looking
|
|
|
|
|
August 31, 2007
|
|
|
|
|
View from the cove
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
First 11 deck slabs (44 feet) placed
|
Insulation complete on piped utilities through Bent #3
|
|
|
|
|
|
|
Utility trays installed through Bent #15; all pile caps now in place with
Bent #16 soon to be stripped; piles at right are for end floating dock
|
Insulated stainless steel utility boxes; large boxes are for fire protection
and domestic water services; small boxes are for sewage pump-out
|
|
|
|
|
August 28 & 29, 2007
|
|
|
|
|
View from abutment . . . utility installation well underway
|
Edge beams installed through Bent #12 of 17
|
|
|
|
|
|
|
Insulating of fire protection, potable water and sewer lines
|
Utility installation progressing at Bent #11
|
|
|
|
|
August 24, 2007
|
|
|
|
|
View from the cove . . . the pier is really starting to take shape
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
First deck slab in place
|
Swinging second deck slab
|
|
|
|
|
|
|
Placing second deck slab
|
Wave screen guides with D-fenders
|
|
|
|
|
August 10, 2007
|
|
|
|
|
Pile caps formed at Bents #12 & 13; piles through Bent #17 beyond
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
Utility trays installed at approach trestle
|
More utility trays and edge beams ready to be installed
|
|
|
|
|
August 3, 2007
|
|
|
|
|
View from the south
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
Edge beams from abutment to Bent #3
|
Recently paved pier parking lot . . . architectural pole lights
|
|
|
|
|
|
|
Under-pier utility trays (stored at State Pier)
|
First of the deck slabs (stored at the State Pier)
|
|
|
|

|
|
|
3-ton jib crane mast and arm (store at the State Pier) and hoist
|
Refurbished sewage pump station
|
|
|
|
|
July 27, 2007
|
|
|
|
|
View from the cove
|
View from Fort Constitution Mines Building
|
|
|
|
|
July 20, 2007
|
|
|
|
|
View from the cove
|
View from Fort Constitution Mines Building
|
|
|
|
|
|
|
Six pile cluster at Bent #4 (i.e. at the dog leg)
|
First two edge beam installed
|
|
|
|
|
July 12, 2007
|
|
|
|
|
View from the abutment
|
View from Fort Constitution Mines Building
|
|
|
|
|