UNH  Pier Facility



Home | General Information | Project Status | Project Documents | Photo & Image Galleries  



          Pier Replacement - Photo Chronology

       July 2007 - present

August 2008

Pretty as a picture! A Tyco cable-laying vessel (I think) headed upriver

past the UNH research pier

July 2008

View from the pier, down to research vessels berthed at the floating docks

June 2008

Mobilizing for a federal multi-agency training operation UNH ocean research fleet, finally with a place to call home

May 2008

New Castle Fire Department - testing seawater fill station

March 21, 2008

Visiting U.S. Coast Guard Vessel - Chinook ditto, from the water

March 7, 2008

March 6, 2008

U.S. Coast Guard vessel "Flying Fish"

waiting to escort an LNG tanker into port

The UNH Pier, as viewed from the pier parking lot

February 12, 2008

View from the south (some blurring as photos were "stitched") View from Fort Constitution Mines Building
Reed & Reed lifting their workboat out of the water Demobilization continues . . . load the crane for transport
Research already underway from floating dock Interesting view under the pier . . . not the fish pens, rub rails, battered piles, pile caps, and wave panels at right

February 7, 2008

Gangway installed; dock assembly almost complete 80' long gangway; well-built

February 1, 2008

Last of the concrete floating docks have arrived View from Fort Constitution Mines Building

January 24, 2008

Third delivery of concrete floating docks has arrived Assembly continues

January 18, 2008

Gangway (80' long) and second delivery of floating

docks have arrived on-site

Typical collar assembly at guide piles

View from the south

View from Fort Constitution Mines Building

January 16, 2008

First delivery of concrete floating docks has arrived

Assembly underway; it isn't as easy as they said it would be

December 28, 2007

December 5, 2007

Christmas was white but otherwise uneventful.

Looking forward to January, when floating docks

and electricity are both anticipated.

Reed & Reed pretty much wrapping things up until

the arrival of the floating docks.

November 30, 2007

View from the cove; beautiful day View from Fort Constitution Mines Building

November 27 & 28, 2007

Finishing up the paving View along the south side of the pier; UNH fish pens below

November 21, 2007

View from the cove Juxtaposition
View from the abutment Life ring and fire extinguisher cabinets
Final assembly of guide pile bent for end floating dock Electrical unit substation

November 13, 2007

Intake strainer for New Castle Fire Department's

seawater fill station

Mast for jib crane erected 

November 9, 2007

Power pedestal with 110-volt and 220-volt outlets

as well as tel/data capabilities

Electric davit for small loads 

November 7, 2007

View from the other side of Harts Cove View from Fort Constitution Mines Building
View along side north side of pier Water view of north side of pier

November 2, 2007

Preparing to install guide for floating docks Several floating dock guides installed 

October 31, 2007

View from pier support facility site View from Fort Constitution Mines Building
View along side south side of pier Davit base (one of four provided)
Jib crane pieces waiting to be erected Water utility box - ready for heat trace and insulation

October 26, 2007

View from New Castle Town Landing . . . awesome! View from Fort Constitution Mines Building
View from neighbor's house 80' long gangway for floating docks; stored off-site
View from the end of the pier All of the concrete deck overlay has been placed
Water utility box, not yet piped Sewer pump out station

October 19, 2007

Pea soup view from the end of the pier looking toward shore Pea soup view from Fort Constitution Mines Building
Mooring bollard with pipe horns installed Ladder on north side of pier, mounted to wave/fender panels

October 16, 2007

View from the cove View from Fort Constitution Mines Building

October 12, 2007

View from the cove View from Fort Constitution Mines Building
View from the neighbor's house View from New Castle Town Landing
Drilling for jib crane anchor bolts Completed stainless steel platform in sewage pumping station
Words fail me Lowering a mooring bollard into place

October 11, 2007

View from hillside behind pier support facility Stainless steel platform inside sewage pumping station
Stainless steel railing installation begins Mooring bollard in progress . . . up periscope!

 October 5, 2007

View from the cove View from Fort Constitution Mines Building

 September 28, 2007

View from the cove View from Fort Constitution Mines Building

 September 21, 2007

View from the cove; deck slabs installed to Bent #15 of 17 View from Fort Constitution Mines Building
UNH's Gulf Challenger looking for a port to call home Close-up - Bents #12 through #17
View from end of pier Looking toward end of pier
Vertical black elements are guide rails for fish pens Wave/fendering panels being prepared for installation

 September 18-19, 2007

Sept. 18 - View from the cove; deck slabs to Bent #9 of 17 Sept. 19 - View from the cove; deck slabs to Bent #12 of 17

 September 14, 2007

View from the cove; deck slabs to Bent #7 of 17 View from Fort Constitution Mines Building

 September 12, 2007

View from the cove South side of pier
Deck slabs in place through Bent #5 of 17 Last two edge beams installed

 September 7, 2007

View from the cove View from Fort Constitution Mines Building
Utility work continues Domestic water and fire service branch lines
Deck slabs installed to Bent #4 (at dog leg) of 17 This is the pile cap for which we have been looking

 August 31, 2007

View from the cove View from Fort Constitution Mines Building
First 11 deck slabs (44 feet) placed Insulation complete on piped utilities through Bent #3
Utility trays installed through Bent #15; all pile caps now in place with Bent #16 soon to be stripped; piles at right are for end floating dock Insulated stainless steel utility boxes; large boxes are for fire protection and domestic water services; small boxes are for sewage pump-out

 August 28 & 29, 2007

View from abutment . . . utility installation well underway Edge beams installed through Bent #12 of 17
Insulating of fire protection, potable water and sewer lines Utility installation progressing at Bent #11

 August 24, 2007

View from the cove . . . the pier is really starting to take shape View from Fort Constitution Mines Building
First deck slab in place Swinging second deck slab
Placing second deck slab Wave screen guides with D-fenders

 August 10, 2007

Pile caps formed at Bents #12 & 13; piles through Bent #17 beyond View from Fort Constitution Mines Building
Utility trays installed at approach trestle More utility trays and edge beams ready to be installed

 August 3, 2007

View from the south View from Fort Constitution Mines Building
Edge beams from abutment to Bent #3 Recently paved pier parking lot . . . architectural pole lights
Under-pier utility trays (stored at State Pier) First of the deck slabs (stored at the State Pier)

3-ton jib crane mast and arm (store at the State Pier) and hoist Refurbished sewage pump station

 July 27, 2007

View from the cove View from Fort Constitution Mines Building

 July 20, 2007

View from the cove View from Fort Constitution Mines Building
Six pile cluster at Bent #4 (i.e. at the dog leg) First two edge beam installed

 July 12, 2007

View from the abutment View from Fort Constitution Mines Building

 

FACILITIES DESIGN AND CONSTRUCTION
22 Colovos Road    Durham, New Hampshire   03824-3515
Voice: 603-862-4452    Fax: 603-862-3927

Copyright 2008, The University of New Hampshire, Durham, NH 03824
UNH is part of the University System of New Hampshire.