          Pier Support Facility - Photo Chronology

September 10, 2008

A stitched photo; pardon the slight "fish eye" distortion.

September 10, 2008

August 27, 2008

Front porch construction is underway. Window installation is underway.

July 30, 2008

Framing of the main building is nearing completion.

Roofing of the main building is well underway.

July 16, 2008

A stitched photo; pardon the slight "fish eye" distortion.
As viewed from the New Castle Town Landing,

most would agree that the UNH pier support facility

is relatively unobtrusive.

Likewise when viewed from Fellows Court.

June 25, 2008

The "barn" is being shingled while the framing of the main building beyond continues. Photo from Ocean Street.

June 18, 2008

June 11, 2008

Smaller public restroom structure attached to the "barn"; the office end of the main building is taking shape beyond. The "barn" with attached public restrooms at center;

the "lean-to" storage building at right.

June 9, 2008

The "barn" has been closed in.. Framed exterior walls at the office end of the main building.

May 27, 2008

"Barn" walls are complete; ready for roof trusses;

the "lean-to" storage building is tucked neatly out of sight.

May 16, 2008

Roof framing underway on "lean-to" storage building. Open front of "lean-to" storage building intended to accommodate refrigerated storage containers.

May 13, 2008

Placing the concrete floor in the "barn" . . . . . . and the "lean-to" storage building.

May 9, 2008

Foundations are well underway and slab placement has commenced for the main building, which will have an open office area, a small conference room, a dive locker, a workshop/garage, and four tempered storage rooms. Construction of exterior walls for the "barn" is underway.

May 5, 2008

April 11, 2008

Exterior walls of the "lean-to" storage building. Retaining wall nearly complete.

April 4, 2008

March 26, 2008

Base courses in place for unit concrete retaining wall

located between the UNH pier support facility

and the Coast Guard's duplex residence.

Foundation walls for the "lean-to" storage building, which is tucked completely into the granite hillside.

 March 7, 2008

 March 6, 2008

Foundation walls for the public restrooms, which are attached to the south end of the "barn", are being formed.

Foundation for the "barn" is complete.

 February 29, 2008

February 25, 2008

Forming of the foundation walls for

the "barn" is underway.

Excavation for the "barn"; vertical pipes are

domestic water lines and fire service lines in from

Ocean Street (at left) and out to the pier (at right).

 February 1, 2008

View from the pier parking lot toward the construction site for the pier support facility; USCG duplex on hill beyond.

View across the driveway toward what will be the parking lot for the pier support facility; Ocean Street beyond.

 January 24, 2008

January 18, 2008

Encasing the USCG electrical and communications

ductbanks in concrete for protection.

Newly installed PSNH pad-mount electrical

transformer to serve the UNH pier facility.

 January 16, 2008

January 8, 2008

Electrical and communications ductbank running from the sector cabinets toward the Coast Guard Station;

1920 mining casemate buried into hillside beyond.

Communications handholes in concrete pad at left; pad for PSNH electrical sector cabinet on right; Coast Guard Station Portsmouth Harbor and Battery Elon Farnsworth beyond.

 December 28, 2007

Transformer pad in place. Pad for electrical sector cabinet at left; Verizon, CATV and UNH tel/data handholes on right.

 December 12, 2007

New ductbank from sector cabinets toward transformer pad; prior to concrete encasement. Placing blasting mats prior to a detonation.
Newly established vertical rock face located behind what will be the bulk feed storage building. A sample of colorfully veined granite removed from the hillside.

 December 10, 2007

Laying out the electrical and communications sector cabinets. New water service to USCG duplex being installed.

 December 5, 2007

Loading drill holes with dynamite. Concrete encasement of a new water line that runs under an existing sewer line . . . this is done when standard separation distances between water and sewer lines are not possible.

 November 30, 2007

Drill holes for blasting at bulk feed storage building. Placing blasting mats immediately prior to detonation.

 November 26, 2007

Concrete encased electrical/communications ductbank. Ready for more conduits to be installed.

 November 21, 2007

Assembling conduits for electrical/communications ductbank. Assembly preparation.

 November 9, 2007

Trenching for relocated USCG water main. New/relocated USCG water main around proposed buildings.

 November 7, 2007

Excavation for electrical/communications ductbank from Wentworth Road across Town property. Conduit for electrical/communications ductbank.

 October 26, 2007

Further hillside excavation pending rock removal. Screening machine sits in future location of office wing.
Water line removed to make way for bulk feed bldg. Mt. Dzioba.

 October 19, 2007

Excavation into the hillside continues. Screened material.

 October 16, 2007

Excavation into hillside underway for bulk feed storage bldg. Old foundation removed near Ocean Street.

 

FACILITIES DESIGN AND CONSTRUCTION
22 Colovos Road    Durham, New Hampshire   03824-3515
Voice: 603-862-4452    Fax: 603-862-3927

Copyright 2008, The University of New Hampshire, Durham, NH 03824
UNH is part of the University System of New Hampshire.